Low Cost Journal,International Peer Reviewed and Refereed Journals,Fast Paper Publication approved journal IJEDR(ISSN 2321-9939) apply for ugc care approved journal, UGC Approved Journal, ugc approved journal, ugc approved list of journal, ugc care journal, care journal, UGC-CARE list, New UGC-CARE Reference List, UGC CARE Journals, ugc care list of journal, ugc care list 2020, ugc care approved journal, ugc care list 2020, new ugc approved journal in 2020, Low cost research journal, Online international research journal, Peer-reviewed, and Refereed Journals, scholarly journals, impact factor 7.37 (Calculate by google scholar and Semantic Scholar | AI-Powered Research Tool)
INTERNATIONAL JOURNAL OF ENGINEERING DEVELOPMENT AND RESEARCH
(International Peer Reviewed,Refereed, Indexed, Citation Open Access Journal)
ISSN: 2321-9939 | ESTD Year: 2013

Current Issue

Call For Papers
June 2023

Volume 11 | Issue 2
Last Date : 29 June 2023
Review Results: Within 12-20 Days

For Authors

Archives

Indexing Partner

Research Area

LICENSE

Paper Details
Paper Title
Impact of Cost and Time Overrun on Building Construction Projects
Authors
  SANTOSH KUMAR PRAJAPATI,  RAKESH GUPTA ,  Dr. Mukesh Pandey

Abstract
This dissertation presents a study made on causes, effects and controls of change orders in large building construction in Morena city. To achieve the study objective, the researcher carried a literature review of the subject covering periodicals, dissertations, previous research studies and books written on the subject of change orders. In light of the literature study the researcher developed a survey questionnaire. Response from 50 consultants and contractors working in the field of large building construction were analyzed. Time and Cost overrun was reported of the original contract duration. The study also concluded that the owner is the major source of changes and that most changes are architectural. Change of plans and material substitution are first causes of change in large buildings. The study also concluded that responses from contractors and consultants agree about the causes, effects and controls of change orders and recommended to include the owner in future studies to verify the reasons behind changes made by the owners

Keywords- Cost Overrun, Time Overrun, Cause, Effect, Time Maintena- nce, Construction Projects, Importance Index (IMPI), Public Construction Sector
Publication Details
Unique Identification Number - IJEDR1604122
Page Number(s) - 822-827
Pubished in - Volume 4 | Issue 4 | December 2016
DOI (Digital Object Identifier) -   
Publisher - IJEDR (ISSN - 2321-9939)
Cite this Article
  SANTOSH KUMAR PRAJAPATI,  RAKESH GUPTA ,  Dr. Mukesh Pandey,   "Impact of Cost and Time Overrun on Building Construction Projects", International Journal of Engineering Development and Research (IJEDR), ISSN:2321-9939, Volume.4, Issue 4, pp.822-827, December 2016, Available at :http://www.ijedr.org/papers/IJEDR1604122.pdf
Share This Article


Article Preview

ISSN Details




DOI Details



Providing A digital object identifier by DOI
How to get DOI?

For Reviewer /Referral (RMS)

Important Links

NEWS & Conference

Digital Library

Our Social Link

© Copyright 2024 IJEDR.ORG All rights reserved