This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License
|
||||||||
|
Paper Details
Paper Title
Optimization of Grit Changing Time Duration In Coated Disc Manufacturing Plant By Using PLC Automation
Authors
  Avisek Jana,  Dr. Marpu Indira Rani
Abstract
• The objective of this work is to optimize the grit changing time for efficiency of production uptime at the same time to reduce labor and working time and as well as increase the productivity. Idea behind this work is to control the quantity and quality of abrasive products caused by high level automation, latest technology and equipments. And the same time the rapid growth of the abrasive market capacity.• In order to satisfy the grit changing time reduce as well as quantity and quality of abrasive products, modification of high speed maker machine with automatic control system based on Allen Bradely PLC 1756 is introduced in details
Keywords- plc automation, production rate, time duration, coated abrasive
Publication Details
Unique Identification Number - IJEDR1704172Page Number(s) - 1071-1077Pubished in - Volume 5 | Issue 4 | December 2017DOI (Digital Object Identifier) -    http://doi.one/10.8/ijedr.17493Publisher - IJEDR (ISSN - 2321-9939)
Cite this Article
  Avisek Jana,  Dr. Marpu Indira Rani,   "Optimization of Grit Changing Time Duration In Coated Disc Manufacturing Plant By Using PLC Automation", International Journal of Engineering Development and Research (IJEDR), ISSN:2321-9939, Volume.5, Issue 4, pp.1071-1077, December 2017, Available at :http://www.ijedr.org/papers/IJEDR1704172.pdf
Article Preview
|
|
||||||
|