Low Cost Journal,International Peer Reviewed and Refereed Journals,Fast Paper Publication approved journal IJEDR(ISSN 2321-9939) apply for ugc care approved journal, UGC Approved Journal, ugc approved journal, ugc approved list of journal, ugc care journal, care journal, UGC-CARE list, New UGC-CARE Reference List, UGC CARE Journals, ugc care list of journal, ugc care list 2020, ugc care approved journal, ugc care list 2020, new ugc approved journal in 2020, Low cost research journal, Online international research journal, Peer-reviewed, and Refereed Journals, scholarly journals, impact factor 7.37 (Calculate by google scholar and Semantic Scholar | AI-Powered Research Tool)
INTERNATIONAL JOURNAL OF ENGINEERING DEVELOPMENT AND RESEARCH
(International Peer Reviewed,Refereed, Indexed, Citation Open Access Journal)
ISSN: 2321-9939 | ESTD Year: 2013

Current Issue

Call For Papers
June 2023

Volume 11 | Issue 2
Last Date : 29 June 2023
Review Results: Within 12-20 Days

For Authors

Archives

Indexing Partner

Research Area

LICENSE

Paper Details
Paper Title
Rework overruns for building construction projects
Authors
  Ekta Patel,  Neetu B Yadav

Abstract
Rework is defined as unnecessary process of re-doing a work activity that was incorrectly carried out the first time. Rework is a major contributor to time wastage and schedule overruns which eventually impact on cost, resources and quality. To carry out this research work we had considered two residential projects. The study has conducted for the area of Surat region of south Gujarat. This Study has been conducted for the Objective, to calculate total cost growth and schedule growth from rework. From this study we are able to say that cost growth for both projects are between 20-26% and schedule growth for both projects are between 11-34% from the original. From this Study we conclude that rework is generated due to inadequate practices and avoidance of the stakeholders so it’s necessary to efficiently execute the work and must be follow all the necessary guidelines so that total amount of rework and overrun can mitigate. It’s also clearly visible that cost and schedule growth effected due to rework in the construction project.

Keywords- Rework, Overruns, Cost growth, Schedule growth, Project performance
Publication Details
Unique Identification Number - IJEDR1802053
Page Number(s) - 300-304
Pubished in - Volume 6 | Issue 2 | April 2018
DOI (Digital Object Identifier) -   
Publisher - IJEDR (ISSN - 2321-9939)
Cite this Article
  Ekta Patel,  Neetu B Yadav,   "Rework overruns for building construction projects", International Journal of Engineering Development and Research (IJEDR), ISSN:2321-9939, Volume.6, Issue 2, pp.300-304, April 2018, Available at :http://www.ijedr.org/papers/IJEDR1802053.pdf
Share This Article


Article Preview

ISSN Details




DOI Details



Providing A digital object identifier by DOI
How to get DOI?

For Reviewer /Referral (RMS)

Important Links

NEWS & Conference

Digital Library

Our Social Link

© Copyright 2024 IJEDR.ORG All rights reserved